Huayingtech ·Internet & Data Center
Internet Data CenterIndustry Solutions
Charge for compute, networking, and operations per rack.
The core constraints for data center projects are power, cooling, and delivery timelines. We recommend complete rack solutions and liquid cooling based on power density per cabinet, while also providing integrated networking and operations equipment to minimize multi-party coordination.
kW/cabinet
Select based on power density
2 Class
Air-cooled vs. Liquid-cooled Solutions
1 sets
Data Center Inspection and Alerts
Industry Challenges
- · High GPU server power consumption leads to insufficient capacity in both power distribution and cooling systems.
- · Mixed training and inference workloads hinder resource utilization efficiency.
- · Large data center floor area conflicts with frequent manual inspections and safety requirements.
Solution Composition
Proposal01 · Configure separately for training and inference.
AI Compute Cluster
Training clusters are delivered as full racks with liquid cooling or high-power air cooling; inference nodes use higher-density models. Storage and networking are planned in sync based on bandwidth ratios.
Use Cases:Large model training, inference services, and scientific computing
Products involved:NVIDIA GPUs with DGX, Supermicro, Inspur, Huawei, and FusionServer
Deliverables:Power and thermal assessment, cabinet-level delivery, cluster deployment and scheduling, stress testing and acceptance
Proposal02 · Design east-west and egress links together.
Data Center Networking and Transmission
The server room uses high-density optical modules and switches for networking. The campus edge is carried by OTN, cross-data center links are redundant, and bandwidth is reserved based on peak business demand.
Use Cases:Create Data Center, Interconnect Data Centers, Multi-Cloud Egress
Products involved:Huawei Transmission, ZTE Transmission, Ruijie Networks, Supermicro Networking and High-Speed Interconnect, H3C Servers
Deliverables:Topology and bandwidth design, optical module allocation, link cutover, monitoring and alerting
Proposal03 · Fewer people, more data.
Data Center Operations and Inspection
Wheel-based robots inspect cabinet indicator lights and environmental parameters in server room aisles; quadruped robots handle outdoor campuses and generator areas. Anomalies automatically generate work orders.
Use Cases:Large data centers, edge server rooms, campus diesel generators, and power distribution areas
Products involved:Lunqu Autonomous Vehicles, DeepRobotics Robots, Ruijie Vision IoT, Lenovo Servers, Huawei IdeaHub Collaboration Tablets
Deliverables:Inspection routes and checkpoints, environmental and status data collection, alarm work order integration, operations training
Support & Services
Rack Power Calculation · Full Rack Delivery & Installation · Cluster & Network Integration · Managed Operations
Huaying Technology Co., Ltd. · Enterprise Hardware & Security Solutions Provider
Main Line 010-8298-1888 · Customer Service 400-606-8166 · Building 7, No. 2 Guanghua Road, Chaoyang District, Beijing
Specifications and configurations in this brochure are subject to the selection list and final contract. Please consult sales for pricing.